ND Queue Project MPC04100 — Wind in Grand Forks, North Dakota

ND Queue Project MPC04100 — Wind in Grand Forks, North Dakota is a 300.0 MW wind interconnection project in Grand Forks, North Dakota with a current status of withdrawn. It is proposed to connect at Prairie 230 kV.

300.0 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology

Project facts

Canonical nameND Queue Project MPC04100 — Wind in Grand Forks, North Dakota
Queue IDMPC04100
Statuswithdrawn
Source status
MarketND
TechnologyWind
Capacity300.0 MW
StateNorth Dakota
CountyGrand Forks
Point of interconnectionPrairie 230 kV
Requested (queue) date2019-04-25
Proposed in-service date2023-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerMinnkota Power Cooperative

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: minnkota-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata