ND Queue Project MPC04200 — Solar in Nd Clearwater, North Dakota
ND Queue Project MPC04200 — Solar in Nd Clearwater, North Dakota is a 153.6 MW solar interconnection project in Nd Clearwater, North Dakota with a current status of withdrawn. It is proposed to connect at Winger-Wilton 230 kV.
153.6 MWCapacity
WithdrawnStatus
NDMarket
SolarTechnology
Project facts
| Canonical name | ND Queue Project MPC04200 — Solar in Nd Clearwater, North Dakota |
|---|---|
| Queue ID | MPC04200 |
| Status | withdrawn |
| Source status | — |
| Market | ND |
| Technology | Solar |
| Capacity | 153.6 MW |
| State | North Dakota |
| County | Nd Clearwater |
| Point of interconnection | Winger-Wilton 230 kV |
| Requested (queue) date | 2020-11-02 |
| Proposed in-service date | 2024-10-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Minnkota Power Cooperative |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: minnkota-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata