ND Queue Project MPC04200 — Solar in Nd Clearwater, North Dakota

ND Queue Project MPC04200 — Solar in Nd Clearwater, North Dakota is a 153.6 MW solar interconnection project in Nd Clearwater, North Dakota with a current status of withdrawn. It is proposed to connect at Winger-Wilton 230 kV.

153.6 MWCapacity
WithdrawnStatus
NDMarket
SolarTechnology

Project facts

Canonical nameND Queue Project MPC04200 — Solar in Nd Clearwater, North Dakota
Queue IDMPC04200
Statuswithdrawn
Source status
MarketND
TechnologySolar
Capacity153.6 MW
StateNorth Dakota
CountyNd Clearwater
Point of interconnectionWinger-Wilton 230 kV
Requested (queue) date2020-11-02
Proposed in-service date2024-10-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerMinnkota Power Cooperative

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: minnkota-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.