ND Queue Project MPC04300 — Wind in Steele, North Dakota

ND Queue Project MPC04300 — Wind in Steele, North Dakota is a 457.3 MW wind interconnection project in Steele, North Dakota with a current status of withdrawn. It is proposed to connect at Center-Prairie 345 kV Line.

457.3 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology

Project facts

Canonical nameND Queue Project MPC04300 — Wind in Steele, North Dakota
Queue IDMPC04300
Statuswithdrawn
Source status
MarketND
TechnologyWind
Capacity457.3 MW
StateNorth Dakota
CountySteele
Point of interconnectionCenter-Prairie 345 kV Line
Requested (queue) date2021-07-15
Proposed in-service date2024-11-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerMinnkota Power Cooperative

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: minnkota-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata