ND Queue Project MPC04500 — Wind in Grand Forks, North Dakota

ND Queue Project MPC04500 — Wind in Grand Forks, North Dakota is a 258.4 MW wind interconnection project in Grand Forks, North Dakota with a current status of withdrawn. It is proposed to connect at Lerfald Substation.

258.4 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology

Project facts

Canonical nameND Queue Project MPC04500 — Wind in Grand Forks, North Dakota
Queue IDMPC04500
Statuswithdrawn
Source status
MarketND
TechnologyWind
Capacity258.4 MW
StateNorth Dakota
CountyGrand Forks
Point of interconnectionLerfald Substation
Requested (queue) date2023-09-26
Proposed in-service date2028-03-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerMinnkota Power Cooperative

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: minnkota-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata