ND OTM LLC Generator Reactivation (945)

ND OTM LLC Generator Reactivation is a 8.0 MW other interconnection project in Penobscot, Maine with a current status of operational. It is proposed to connect at Emera Maine 46 kv Line 5/7 / Old Town Maine @ Penobscot River.

8.0 MWCapacity
OperationalStatus
BHEMarket
OtherTechnology

Project facts

Canonical nameND OTM LLC Generator Reactivation
Queue ID945
Statusoperational
Source statusC
MarketBHE
TechnologyOther
Capacity8.0 MW
StateMaine
CountyPenobscot
Point of interconnectionEmera Maine 46 kv Line 5/7 / Old Town Maine @ Penobscot River
Requested (queue) date2019-12-18
Proposed in-service date
Operational date2021-06-05
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata