NE Clean Power Link - controllable HVDC Tie - Import only (501)
NE Clean Power Link - controllable HVDC Tie - Import only is a 1,000.0 MW generation interconnection project in Windsor, Vermont with a current status of withdrawn. It is proposed to connect at HQ 735 kV substation to VELCO 345 kV Coolidge substation.
1,000.0 MWCapacity
WithdrawnStatus
VTMarket
GenerationTechnology
Project facts
| Canonical name | NE Clean Power Link - controllable HVDC Tie - Import only |
|---|---|
| Queue ID | 501 |
| Status | withdrawn |
| Source status | W |
| Market | VT |
| Technology | Generation |
| Capacity | 1,000.0 MW |
| State | Vermont |
| County | Windsor |
| Point of interconnection | HQ 735 kV substation to VELCO 345 kV Coolidge substation |
| Requested (queue) date | 2015-02-16 |
| Proposed in-service date | 2027-12-31 |
| Operational date | — |
| Withdrawn date | 2026-06-23 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata