Nearman 161 kV Substation (ERAS-2025-029)

Nearman 161 kV Substation is a 170.0 MW battery interconnection project in Kansas City, Kansas with a current status of operational. It is proposed to connect at Nearman 161 kV Substation.

170.0 MWCapacity
OperationalStatus
KSMarket
BatteryTechnology

Project facts

Canonical nameNearman 161 kV Substation
Queue IDERAS-2025-029
Statusoperational
Source statusERAS
MarketKS
TechnologyBattery
Capacity170.0 MW
StateKansas
CountyKansas City
Point of interconnectionNearman 161 kV Substation
Requested (queue) date2025-10-02
Proposed in-service date
Operational date2026-11-02
Withdrawn date
Developer
Utility / transmission ownerKACY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.