NECEC 1200 MW HVDC (import only) - controllable (639)
NECEC 1200 MW HVDC (import only) - controllable is a 1,200.0 MW generation interconnection project in Androscoggin, Maine with a current status of operational. It is proposed to connect at CMP Larrabee Rd 345 kV Substation.
1,200.0 MWCapacity
OperationalStatus
MEMarket
GenerationTechnology
Project facts
| Canonical name | NECEC 1200 MW HVDC (import only) - controllable |
|---|---|
| Queue ID | 639 |
| Status | operational |
| Source status | C |
| Market | ME |
| Technology | Generation |
| Capacity | 1,200.0 MW |
| State | Maine |
| County | Androscoggin |
| Point of interconnection | CMP Larrabee Rd 345 kV Substation |
| Requested (queue) date | 2017-04-19 |
| Proposed in-service date | — |
| Operational date | 2025-12-31 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata