NECEC 1200 MW HVDC (import only) - controllable (639)

NECEC 1200 MW HVDC (import only) - controllable is a 1,200.0 MW generation interconnection project in Androscoggin, Maine with a current status of operational. It is proposed to connect at CMP Larrabee Rd 345 kV Substation.

1,200.0 MWCapacity
OperationalStatus
MEMarket
GenerationTechnology

Project facts

Canonical nameNECEC 1200 MW HVDC (import only) - controllable
Queue ID639
Statusoperational
Source statusC
MarketME
TechnologyGeneration
Capacity1,200.0 MW
StateMaine
CountyAndroscoggin
Point of interconnectionCMP Larrabee Rd 345 kV Substation
Requested (queue) date2017-04-19
Proposed in-service date
Operational date2025-12-31
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata