Nekoma - Balzine 69kV (GEN-2009-019S)
Nekoma - Balzine 69kV is a 19.5 MW wind interconnection project in Rush County, Kansas with a current status of withdrawn. It is proposed to connect at Nekoma - Balzine 69kV.
19.5 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology
Project facts
| Canonical name | Nekoma - Balzine 69kV |
|---|---|
| Queue ID | GEN-2009-019S |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | KS |
| Technology | Wind |
| Capacity | 19.5 MW |
| State | Kansas |
| County | Rush County |
| Point of interconnection | Nekoma - Balzine 69kV |
| Requested (queue) date | 2009-04-15 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | MIDW |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata