NELSON 138 SWYD - LONGVILLE (CLECO) 138.0kV (J3609)

NELSON 138 SWYD - LONGVILLE (CLECO) 138.0kV is a 93.1 MW solar interconnection project in Beauregard, Louisiana with a current status of withdrawn. It is proposed to connect at NELSON 138 SWYD - LONGVILLE (CLECO) 138.0kV.

93.1 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameNELSON 138 SWYD - LONGVILLE (CLECO) 138.0kV
Queue IDJ3609
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity93.1 MW
StateLouisiana
CountyBeauregard
Point of interconnectionNELSON 138 SWYD - LONGVILLE (CLECO) 138.0kV
Requested (queue) date2024-04-02
Proposed in-service date2027-12-27
Operational date2027-12-27
Withdrawn date2025-09-30
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.