Nelson Road – Murphy 345kV line (J984)

Nelson Road – Murphy 345kV line is a 200.0 MW wind interconnection project in Gratiot County, Michigan with a current status of operational. It is proposed to connect at Nelson Road – Murphy 345kV line.

200.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameNelson Road – Murphy 345kV line
Queue IDJ984
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity200.0 MW
StateMichigan
CountyGratiot County
Point of interconnectionNelson Road – Murphy 345kV line
Requested (queue) date2018-03-12
Proposed in-service date2021-06-01
Operational date2021-06-01
Withdrawn date
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.