Neosho-Delaware 345 kV (GEN-2020-052)

Neosho-Delaware 345 kV is a 251.0 MW wind interconnection project in Labette Co, Kansas with a current status of withdrawn. It is proposed to connect at Neosho-Delaware 345 kV.

251.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameNeosho-Delaware 345 kV
Queue IDGEN-2020-052
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity251.0 MW
StateKansas
CountyLabette Co
Point of interconnectionNeosho-Delaware 345 kV
Requested (queue) date2020-04-29
Proposed in-service date2025-12-15
Operational date
Withdrawn date2024-03-11
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.