Neosho-Delaware 345kV line (GEN-2018-080)

Neosho-Delaware 345kV line is a 200.0 MW solar interconnection project in Craig, Oklahoma with a current status of withdrawn. It is proposed to connect at Neosho-Delaware 345kV line.

200.0 MWCapacity
WithdrawnStatus
OKMarket
SolarTechnology

Project facts

Canonical nameNeosho-Delaware 345kV line
Queue IDGEN-2018-080
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologySolar
Capacity200.0 MW
StateOklahoma
CountyCraig
Point of interconnectionNeosho-Delaware 345kV line
Requested (queue) date2018-11-18
Proposed in-service date
Operational date
Withdrawn date2020-04-16
Developer
Utility / transmission ownerSPP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.