Neset 230 kV Substation (GEN-2017-048)
Neset 230 kV Substation is a 300.0 MW wind interconnection project in Williams County, North Dakota with a current status of withdrawn. It is proposed to connect at Neset 230 kV Substation.
300.0 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology
Project facts
| Canonical name | Neset 230 kV Substation |
|---|---|
| Queue ID | GEN-2017-048 |
| Status | withdrawn |
| Source status | TERMINATED |
| Market | ND |
| Technology | Wind |
| Capacity | 300.0 MW |
| State | North Dakota |
| County | Williams County |
| Point of interconnection | Neset 230 kV Substation |
| Requested (queue) date | 2017-05-31 |
| Proposed in-service date | 2027-12-31 |
| Operational date | — |
| Withdrawn date | 2025-11-17 |
| Developer | — |
| Utility / transmission owner | BEPC |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata