Neset 230 kV Substation (GEN-2017-048)

Neset 230 kV Substation is a 300.0 MW wind interconnection project in Williams County, North Dakota with a current status of withdrawn. It is proposed to connect at Neset 230 kV Substation.

300.0 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology

Project facts

Canonical nameNeset 230 kV Substation
Queue IDGEN-2017-048
Statuswithdrawn
Source statusTERMINATED
MarketND
TechnologyWind
Capacity300.0 MW
StateNorth Dakota
CountyWilliams County
Point of interconnectionNeset 230 kV Substation
Requested (queue) date2017-05-31
Proposed in-service date2027-12-31
Operational date
Withdrawn date2025-11-17
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata