Nevada-Butler 161 kV Line (GEN-2024-033)

Nevada-Butler 161 kV Line is a 225.0 MW solar interconnection project in Vernon, Missouri with a current status of withdrawn. It is proposed to connect at Nevada-Butler 161 kV Line.

225.0 MWCapacity
WithdrawnStatus
MOMarket
SolarTechnology

Project facts

Canonical nameNevada-Butler 161 kV Line
Queue IDGEN-2024-033
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologySolar
Capacity225.0 MW
StateMissouri
CountyVernon
Point of interconnectionNevada-Butler 161 kV Line
Requested (queue) date2024-10-30
Proposed in-service date2028-12-31
Operational date
Withdrawn date2025-12-03
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata