Neville 23 kV (AG1-291)
Neville 23 kV is a 16.8 MW other interconnection project in Allegheny, Pennsylvania with a current status of withdrawn.
16.8 MWCapacity
WithdrawnStatus
—Market
OtherTechnology
Project facts
| Canonical name | Neville 23 kV |
|---|---|
| Queue ID | AG1-291 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Other |
| Capacity | 16.8 MW |
| State | Pennsylvania |
| County | Allegheny |
| Point of interconnection | — |
| Requested (queue) date | 2020-09-28 |
| Proposed in-service date | 2025-12-15 |
| Operational date | — |
| Withdrawn date | 2025-05-19 |
| Developer | — |
| Utility / transmission owner | DL |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata