New 115 kV Creston Substation (L0619)

New 115 kV Creston Substation is a 10.0 MW other interconnection project in Spokane, Washington with a current status of active. It is proposed to connect at Bell-Creston 115 kV line.

10.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology

Project facts

Canonical nameNew 115 kV Creston Substation
Queue IDL0619
Statusactive
Source statusSTUDY
MarketWA
TechnologyOther
Capacity10.0 MW
StateWashington
CountySpokane
Point of interconnectionBell-Creston 115 kV line
Requested (queue) date2024-08-28
Proposed in-service date2027-09-03
Operational date
Withdrawn date
DeveloperInland Power & Light Company
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata