New 230-115 kV POD at Mabton Substation (L0645)

New 230-115 kV POD at Mabton Substation is a 51.0 MW other interconnection project in Yakima, Washington with a current status of operational. It is proposed to connect at Spring Creek-Wine Country No 1 230kV line (26/5).

51.0 MWCapacity
OperationalStatus
WAMarket
OtherTechnology

Project facts

Canonical nameNew 230-115 kV POD at Mabton Substation
Queue IDL0645
Statusoperational
Source statusBPA COMPLETED
MarketWA
TechnologyOther
Capacity51.0 MW
StateWashington
CountyYakima
Point of interconnectionSpring Creek-Wine Country No 1 230kV line (26/5)
Requested (queue) date2025-03-10
Proposed in-service date
Operational date2028-03-11
Withdrawn date
DeveloperBenton Rural Electric Association
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata