New 345kV Substation on the Emporia-Wichita 345kV line (GEN-2015-050)
New 345kV Substation on the Emporia-Wichita 345kV line is a 464.0 MW other interconnection project in Lyon County, Kansas with a current status of withdrawn. It is proposed to connect at New 345kV Substation on the Emporia-Wichita 345kV line.
464.0 MWCapacity
WithdrawnStatus
KSMarket
OtherTechnology
Project facts
| Canonical name | New 345kV Substation on the Emporia-Wichita 345kV line |
|---|---|
| Queue ID | GEN-2015-050 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | KS |
| Technology | Other |
| Capacity | 464.0 MW |
| State | Kansas |
| County | Lyon County |
| Point of interconnection | New 345kV Substation on the Emporia-Wichita 345kV line |
| Requested (queue) date | 2015-10-05 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2017-04-05 |
| Developer | — |
| Utility / transmission owner | WERE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.