New 345kV Substation on the Emporia-Wichita 345kV line (GEN-2015-050)

New 345kV Substation on the Emporia-Wichita 345kV line is a 464.0 MW other interconnection project in Lyon County, Kansas with a current status of withdrawn. It is proposed to connect at New 345kV Substation on the Emporia-Wichita 345kV line.

464.0 MWCapacity
WithdrawnStatus
KSMarket
OtherTechnology

Project facts

Canonical nameNew 345kV Substation on the Emporia-Wichita 345kV line
Queue IDGEN-2015-050
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyOther
Capacity464.0 MW
StateKansas
CountyLyon County
Point of interconnectionNew 345kV Substation on the Emporia-Wichita 345kV line
Requested (queue) date2015-10-05
Proposed in-service date
Operational date
Withdrawn date2017-04-05
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata