New Boston Solar LLC (1217)

New Boston Solar LLC is a 49.9 MW other interconnection project in Madison, New York with a current status of withdrawn. It is proposed to connect at Line tap between Teal to Oneida 115 kV Substations (Line #2).

49.9 MWCapacity
WithdrawnStatus
CMarket
OtherTechnology

Project facts

Canonical nameNew Boston Solar LLC
Queue ID1217
Statuswithdrawn
Source status0
MarketC
TechnologyOther
Capacity49.9 MW
StateNew York
CountyMadison
Point of interconnectionLine tap between Teal to Oneida 115 kV Substations (Line #2)
Requested (queue) date2021-07-09
Proposed in-service date2023-04-30
Operational date
Withdrawn date
DeveloperEmeren US, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.