New Byers 138kV (S1062)

New Byers 138kV is a 75.0 MW generation interconnection project in Branch, Michigan with a current status of operational. It is proposed to connect at New Byers 138kV.

75.0 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical nameNew Byers 138kV
Queue IDS1062
Statusoperational
Source statusDone
Market
TechnologyGeneration
Capacity75.0 MW
StateMichigan
CountyBranch
Point of interconnectionNew Byers 138kV
Requested (queue) date2024-08-15
Proposed in-service date2026-10-15
Operational date2026-10-15
Withdrawn date
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata