New J1502 TO Switching Station (Emerson) (J3402)

New J1502 TO Switching Station (Emerson) is a 200.0 MW battery interconnection project in Juneau, Wisconsin with a current status of operational. It is proposed to connect at New J1502 TO Switching Station (Emerson).

200.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameNew J1502 TO Switching Station (Emerson)
Queue IDJ3402
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity200.0 MW
StateWisconsin
CountyJuneau
Point of interconnectionNew J1502 TO Switching Station (Emerson)
Requested (queue) date2024-04-18
Proposed in-service date2028-05-31
Operational date2028-05-31
Withdrawn date
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata