New Madrid - Sikeston 161kV (GEN-2017-202)
New Madrid - Sikeston 161kV is a 200.0 MW solar interconnection project in New Madrid, Missouri with a current status of withdrawn. It is proposed to connect at New Madrid - Sikeston 161kV.
200.0 MWCapacity
WithdrawnStatus
MOMarket
SolarTechnology
Project facts
| Canonical name | New Madrid - Sikeston 161kV |
|---|---|
| Queue ID | GEN-2017-202 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | MO |
| Technology | Solar |
| Capacity | 200.0 MW |
| State | Missouri |
| County | New Madrid |
| Point of interconnection | New Madrid - Sikeston 161kV |
| Requested (queue) date | 2017-11-30 |
| Proposed in-service date | 2026-12-01 |
| Operational date | — |
| Withdrawn date | 2024-11-13 |
| Developer | — |
| Utility / transmission owner | SWPA |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata