New Plymouth Substation (L0624)
New Plymouth Substation is a 15.0 MW other interconnection project in Benton, Washington with a current status of operational. It is proposed to connect at McNary Substation - Benton PUD 115 kV radial feed..
15.0 MWCapacity
OperationalStatus
WAMarket
OtherTechnology
Project facts
| Canonical name | New Plymouth Substation |
|---|---|
| Queue ID | L0624 |
| Status | operational |
| Source status | BPA COMPLETED |
| Market | WA |
| Technology | Other |
| Capacity | 15.0 MW |
| State | Washington |
| County | Benton |
| Point of interconnection | McNary Substation - Benton PUD 115 kV radial feed. |
| Requested (queue) date | 2024-09-11 |
| Proposed in-service date | — |
| Operational date | 2027-09-12 |
| Withdrawn date | — |
| Developer | Benton Rural Electric Association |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.