New Scotland BES 1 and 2 (1535)

New Scotland BES 1 and 2 is a 1,350.0 MW battery interconnection project in Albany, New York with a current status of withdrawn. It is proposed to connect at New Scotland 345 kV Substation.

1,350.0 MWCapacity
WithdrawnStatus
FMarket
BatteryTechnology

Project facts

Canonical nameNew Scotland BES 1 and 2
Queue ID1535
Statuswithdrawn
Source status0
MarketF
TechnologyBattery
Capacity1,350.0 MW
StateNew York
CountyAlbany
Point of interconnectionNew Scotland 345 kV Substation
Requested (queue) date2023-03-10
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperEden Renewables
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata