New Scotland BESS (NYISO-C24-045) is a 1,350.0 MW battery interconnection project in Albany, New York with a current status of withdrawn. It is proposed to connect at NYISO New Scotland 345 kV.

1,350.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameNew Scotland BESS (NYISO-C24-045)
Queue ID1597
Statuswithdrawn
Source statusW
Market
TechnologyBattery
Capacity1,350.0 MW
StateNew York
CountyAlbany
Point of interconnectionNYISO New Scotland 345 kV
Requested (queue) date2024-12-12
Proposed in-service date2027-09-01
Operational date
Withdrawn date2025-06-26
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata