New Scotland Interconnection (1155)
New Scotland Interconnection is a 500.0 MW other interconnection project in Albany, New York with a current status of withdrawn. It is proposed to connect at New Scotland Substation.
500.0 MWCapacity
WithdrawnStatus
F, JMarket
OtherTechnology
Project facts
| Canonical name | New Scotland Interconnection |
|---|---|
| Queue ID | 1155 |
| Status | withdrawn |
| Source status | 0 |
| Market | F, J |
| Technology | Other |
| Capacity | 500.0 MW |
| State | New York |
| County | Albany |
| Point of interconnection | New Scotland Substation |
| Requested (queue) date | 2021-04-02 |
| Proposed in-service date | 2022-04-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | CHPE LLC |
| Utility / transmission owner | NYPA |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.