Newkirk 138kV (GEN-2008-071)

Newkirk 138kV is a 76.8 MW wind interconnection project in Kay County, Oklahoma with a current status of withdrawn. It is proposed to connect at Newkirk 138kV.

76.8 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameNewkirk 138kV
Queue IDGEN-2008-071
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity76.8 MW
StateOklahoma
CountyKay County
Point of interconnectionNewkirk 138kV
Requested (queue) date2008-07-14
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.