NewSun 124 MW La Pine (L0686)

NewSun 124 MW La Pine is a 124.0 MW other interconnection project with a current status of active. It is proposed to connect at LaPine Substation.

124.0 MWCapacity
ActiveStatus
Market
OtherTechnology

Project facts

Canonical nameNewSun 124 MW La Pine
Queue IDL0686
Statusactive
Source statusSTUDY
Market
TechnologyOther
Capacity124.0 MW
State
CountyDeschutes
Point of interconnectionLaPine Substation
Requested (queue) date2026-02-18
Proposed in-service date2028-01-01
Operational date
Withdrawn date
DeveloperMidstate Electric Cooperative, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata