NextEra Energy Resources Interconnection Holdings, LLC (632)

NextEra Energy Resources Interconnection Holdings, LLC is a 300.0 MW battery interconnection project in Owyhee, Idaho with a current status of active. It is proposed to connect at Hemingway 230kV Substation.

300.0 MWCapacity
ActiveStatus
IDMarket
BatteryTechnology

Project facts

Canonical nameNextEra Energy Resources Interconnection Holdings, LLC
Queue ID632
Statusactive
Source statusConstruction
MarketID
TechnologyBattery
Capacity300.0 MW
StateIdaho
CountyOwyhee
Point of interconnectionHemingway 230kV Substation
Requested (queue) date2022-01-14
Proposed in-service date2025-12-31
Operational date
Withdrawn date
DeveloperNextera
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata