Niagara Falls Solar (0726)

Niagara Falls Solar is a 24.9 MW solar interconnection project in Niagara, New York with a current status of withdrawn. It is proposed to connect at Line #181 - 115kV.

24.9 MWCapacity
WithdrawnStatus
AMarket
SolarTechnology

Project facts

Canonical nameNiagara Falls Solar
Queue ID0726
Statuswithdrawn
Source status0
MarketA
TechnologySolar
Capacity24.9 MW
StateNew York
CountyNiagara
Point of interconnectionLine #181 - 115kV
Requested (queue) date2018-06-08
Proposed in-service date2018-09-30
Operational date
Withdrawn date
DeveloperNiagara Falls Solar, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.