Nine Canyon 2 (G73-01)

Nine Canyon 2 is a 32.0 MW wind interconnection project in Benton, Washington with a current status of operational. It is proposed to connect at 115 kV McNary-Badger Canyon line (Nine Canyon Substation).

32.0 MWCapacity
OperationalStatus
WAMarket
WindTechnology

Project facts

Canonical nameNine Canyon 2
Queue IDG73-01
Statusoperational
Source statusENERGIZED
MarketWA
TechnologyWind
Capacity32.0 MW
StateWashington
CountyBenton
Point of interconnection115 kV McNary-Badger Canyon line (Nine Canyon Substation)
Requested (queue) date2001-09-18
Proposed in-service date
Operational date2007-11-01
Withdrawn date
DeveloperEnergy Efficiency Solar, Inc. dba ACRO Energy Inc.
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata