Nine Canyon Wind Project is a 63.0 MW wind interconnection project in Benton, Washington with a current status of operational. It is proposed to connect at 115 kV McNary-Badger Canyon line (Nine Canyon Substation).

63.0 MWCapacity
OperationalStatus
WAMarket
WindTechnology

Project facts

Canonical nameNine Canyon Wind Project
Queue IDG5
Statusoperational
Source statusENERGIZED
MarketWA
TechnologyWind
Capacity63.0 MW
StateWashington
CountyBenton
Point of interconnection115 kV McNary-Badger Canyon line (Nine Canyon Substation)
Requested (queue) date2000-08-02
Proposed in-service date
Operational date2001-09-01
Withdrawn date
DeveloperEnergy Efficiency Solar, Inc. dba ACRO Energy Inc.
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.