Nippon Biomass (G0419)

Nippon Biomass is a 7.6 MW gas interconnection project in Clallam, Washington with a current status of operational. It is proposed to connect at At the 69kV bus in BPA's Port Angeles Substation..

7.6 MWCapacity
OperationalStatus
WAMarket
GasTechnology

Project facts

Canonical nameNippon Biomass
Queue IDG0419
Statusoperational
Source statusENERGIZED
MarketWA
TechnologyGas
Capacity7.6 MW
StateWashington
CountyClallam
Point of interconnectionAt the 69kV bus in BPA's Port Angeles Substation.
Requested (queue) date2010-04-01
Proposed in-service date
Operational date2012-04-30
Withdrawn date
DeveloperNippon Paper Industries USA Co., Ltd.
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.