NM Queue Project 2021-G4 — Solar in San Juan County, New Mexico
NM Queue Project 2021-G4 — Solar in San Juan County, New Mexico is a 765.0 MW solar interconnection project in San Juan County, New Mexico with a current status of withdrawn. It is proposed to connect at Lost Canyon - Shiprock 230-kV.
765.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology
Project facts
| Canonical name | NM Queue Project 2021-G4 — Solar in San Juan County, New Mexico |
|---|---|
| Queue ID | 2021-G4 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | NM |
| Technology | Solar |
| Capacity | 765.0 MW |
| State | New Mexico |
| County | San Juan County |
| Point of interconnection | Lost Canyon - Shiprock 230-kV |
| Requested (queue) date | 2021-10-22 |
| Proposed in-service date | 2023-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Western Area Power Administration - Rocky Mountain Region |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28
Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.