NM Queue Project 2021-G4 — Solar in San Juan County, New Mexico

NM Queue Project 2021-G4 — Solar in San Juan County, New Mexico is a 765.0 MW solar interconnection project in San Juan County, New Mexico with a current status of withdrawn. It is proposed to connect at Lost Canyon - Shiprock 230-kV.

765.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameNM Queue Project 2021-G4 — Solar in San Juan County, New Mexico
Queue ID2021-G4
Statuswithdrawn
Source statusWithdrawn
MarketNM
TechnologySolar
Capacity765.0 MW
StateNew Mexico
CountySan Juan County
Point of interconnectionLost Canyon - Shiprock 230-kV
Requested (queue) date2021-10-22
Proposed in-service date2023-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Rocky Mountain Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.