NM Queue Project IA-PNM-2007-08 — Wind in an unlisted county, New Mexico

NM Queue Project IA-PNM-2007-08 — Wind in an unlisted county, New Mexico is a 300.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at El Cabo San Miguel /Torrance Cty, NM Energy Resource.

300.0 MWCapacity
WithdrawnStatus
NMMarket
WindTechnology

Project facts

Canonical nameNM Queue Project IA-PNM-2007-08 — Wind in an unlisted county, New Mexico
Queue IDIA-PNM-2007-08
Statuswithdrawn
Source statusLGIA terminated by PNM 7/31/2015.
MarketNM
TechnologyWind
Capacity300.0 MW
StateNew Mexico
County
Point of interconnectionEl Cabo San Miguel /Torrance Cty, NM Energy Resource
Requested (queue) date2007-05-22
Proposed in-service date
Operational date
Withdrawn date2015-07-31
Developer
Utility / transmission ownerPublic Service Company of New Mexico

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata