NM Queue Project IA-PNM-2012-05 — Wind in an unlisted county, New Mexico

NM Queue Project IA-PNM-2012-05 — Wind in an unlisted county, New Mexico is a 197.8 MW wind interconnection project with a current status of operational. It is proposed to connect at Guadalupe Cty, NM Network Resource Energy Resource.

197.8 MWCapacity
OperationalStatus
NMMarket
WindTechnology

Project facts

Canonical nameNM Queue Project IA-PNM-2012-05 — Wind in an unlisted county, New Mexico
Queue IDIA-PNM-2012-05
Statusoperational
Source statusPISIS Report completed 8/2/13.
MarketNM
TechnologyWind
Capacity197.8 MW
StateNew Mexico
County
Point of interconnectionGuadalupe Cty, NM Network Resource Energy Resource
Requested (queue) date2012-12-19
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPublic Service Company of New Mexico

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata