NM Queue Project IA-PNM-2014-01 — Wind in an unlisted county, New Mexico is a 200.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at On the BB 345 kV line between Guadalupe and Taiban Guadalupe Cty, NM.

200.0 MWCapacity
WithdrawnStatus
NMMarket
WindTechnology

Project facts

Canonical nameNM Queue Project IA-PNM-2014-01 — Wind in an unlisted county, New Mexico
Queue IDIA-PNM-2014-01
Statuswithdrawn
Source status
MarketNM
TechnologyWind
Capacity200.0 MW
StateNew Mexico
County
Point of interconnectionOn the BB 345 kV line between Guadalupe and Taiban Guadalupe Cty, NM
Requested (queue) date2014-02-12
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPublic Service Company of New Mexico

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata