NM Queue Project IA-PNM-2014-05 — Solar+Battery in Switching Station Cibola County, New Mexico
NM Queue Project IA-PNM-2014-05 — Solar+Battery in Switching Station Cibola County, New Mexico is a 49.5 MW solar+battery interconnection project in Switching Station Cibola County, New Mexico with a current status of active. It is proposed to connect at RT 66 Solar Energy Ctr, Route 66 Energy Storage 115 kV Switching Station Cibola County, NM Network Resource.
Project facts
| Canonical name | NM Queue Project IA-PNM-2014-05 — Solar+Battery in Switching Station Cibola County, New Mexico |
|---|---|
| Queue ID | IA-PNM-2014-05 |
| Status | active |
| Source status | LGIA executed 2/13/2017. 1st Revised LGIA executed 12/4/2020. 2nd Revised LGIA executed 12/12/24. 3rd Revised LGIA 12/17/25. |
| Market | NM |
| Technology | Solar+Battery |
| Capacity | 49.5 MW |
| State | New Mexico |
| County | Switching Station Cibola County |
| Point of interconnection | RT 66 Solar Energy Ctr, Route 66 Energy Storage 115 kV Switching Station Cibola County, NM Network Resource |
| Requested (queue) date | 2014-11-12 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Public Service Company of New Mexico |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata