NM Queue Project IA-PNM-2017-01 — Solar in San Fidel Cibola County, New Mexico

NM Queue Project IA-PNM-2017-01 — Solar in San Fidel Cibola County, New Mexico is a 10.0 MW solar interconnection project in San Fidel Cibola County, New Mexico with a current status of active. It is proposed to connect at NextEra Energy On the Bluewater-West Mesa 115 kV Line near San Fidel Cibola County, NM Network Resource.

10.0 MWCapacity
ActiveStatus
NMMarket
SolarTechnology

Project facts

Canonical nameNM Queue Project IA-PNM-2017-01 — Solar in San Fidel Cibola County, New Mexico
Queue IDIA-PNM-2017-01
Statusactive
Source statusLGIA executed 3/17/2020.
MarketNM
TechnologySolar
Capacity10.0 MW
StateNew Mexico
CountySan Fidel Cibola County
Point of interconnectionNextEra Energy On the Bluewater-West Mesa 115 kV Line near San Fidel Cibola County, NM Network Resource
Requested (queue) date2017-01-26
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPublic Service Company of New Mexico

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata