NM Queue Project IA-PNM-2017-16 — Wind in Station Santa Fe County, New Mexico
NM Queue Project IA-PNM-2017-16 — Wind in Station Santa Fe County, New Mexico is a 480.0 MW wind interconnection project in Station Santa Fe County, New Mexico with a current status of withdrawn. It is proposed to connect at New sub to be located South of Norton 345 Station Santa Fe County, NM Energy Resource.
480.0 MWCapacity
WithdrawnStatus
NMMarket
WindTechnology
Project facts
| Canonical name | NM Queue Project IA-PNM-2017-16 — Wind in Station Santa Fe County, New Mexico |
|---|---|
| Queue ID | IA-PNM-2017-16 |
| Status | withdrawn |
| Source status | Withdrawn. |
| Market | NM |
| Technology | Wind |
| Capacity | 480.0 MW |
| State | New Mexico |
| County | Station Santa Fe County |
| Point of interconnection | New sub to be located South of Norton 345 Station Santa Fe County, NM Energy Resource |
| Requested (queue) date | 2017-10-30 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Public Service Company of New Mexico |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata