NM Queue Project IA-PNM-2017-19 — Solar in Valencia County, New Mexico
NM Queue Project IA-PNM-2017-19 — Solar in Valencia County, New Mexico is a 49.9 MW solar interconnection project in Valencia County, New Mexico with a current status of withdrawn. It is proposed to connect at New sub 1.35 miles SW of site Valencia County, NM Network Resource.
49.9 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology
Project facts
| Canonical name | NM Queue Project IA-PNM-2017-19 — Solar in Valencia County, New Mexico |
|---|---|
| Queue ID | IA-PNM-2017-19 |
| Status | withdrawn |
| Source status | Withdrawn. |
| Market | NM |
| Technology | Solar |
| Capacity | 49.9 MW |
| State | New Mexico |
| County | Valencia County |
| Point of interconnection | New sub 1.35 miles SW of site Valencia County, NM Network Resource |
| Requested (queue) date | 2017-10-30 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Public Service Company of New Mexico |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata