NM Queue Project IA-PNM-2018-05 — Battery in an unlisted county, New Mexico
NM Queue Project IA-PNM-2018-05 — Battery in an unlisted county, New Mexico is a 150.0 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Affordable Solar PNM Jicarilla 345 kV Switching Station near Dulce, NM Network Resource.
150.0 MWCapacity
WithdrawnStatus
NMMarket
BatteryTechnology
Project facts
| Canonical name | NM Queue Project IA-PNM-2018-05 — Battery in an unlisted county, New Mexico |
|---|---|
| Queue ID | IA-PNM-2018-05 |
| Status | withdrawn |
| Source status | LGIA terminated 8/29/24. |
| Market | NM |
| Technology | Battery |
| Capacity | 150.0 MW |
| State | New Mexico |
| County | — |
| Point of interconnection | Affordable Solar PNM Jicarilla 345 kV Switching Station near Dulce, NM Network Resource |
| Requested (queue) date | 2018-07-27 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2024-08-29 |
| Developer | — |
| Utility / transmission owner | Public Service Company of New Mexico |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.