NM Queue Project IA-PNM-2019-05 — Solar+Battery in El Dorado Line Santa Fe County, New Mexico

NM Queue Project IA-PNM-2019-05 — Solar+Battery in El Dorado Line Santa Fe County, New Mexico is a 96.0 MW solar+battery interconnection project in El Dorado Line Santa Fe County, New Mexico with a current status of active. It is proposed to connect at Rancho Viejo Zia/Rodeo – El Dorado Line Santa Fe County, NM Energy Resource.

96.0 MWCapacity
ActiveStatus
NMMarket
Solar+BatteryTechnology

Project facts

Canonical nameNM Queue Project IA-PNM-2019-05 — Solar+Battery in El Dorado Line Santa Fe County, New Mexico
Queue IDIA-PNM-2019-05
Statusactive
Source statusLGIA executed 2/13/24. In 3-year Suspension effective 10/23/25.
MarketNM
TechnologySolar+Battery
Capacity96.0 MW
StateNew Mexico
CountyEl Dorado Line Santa Fe County
Point of interconnectionRancho Viejo Zia/Rodeo – El Dorado Line Santa Fe County, NM Energy Resource
Requested (queue) date2019-04-23
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPublic Service Company of New Mexico

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata