NM Queue Project IA-PNM-2019-12 — Wind in Switching Station Torrance County, New Mexico

NM Queue Project IA-PNM-2019-12 — Wind in Switching Station Torrance County, New Mexico is a 80.0 MW wind interconnection project in Switching Station Torrance County, New Mexico with a current status of withdrawn. It is proposed to connect at Clines Corners 345 kV Switching Station Torrance County, NM Energy Resource.

80.0 MWCapacity
WithdrawnStatus
NMMarket
WindTechnology

Project facts

Canonical nameNM Queue Project IA-PNM-2019-12 — Wind in Switching Station Torrance County, New Mexico
Queue IDIA-PNM-2019-12
Statuswithdrawn
Source statusIncreased capacity prior to execution of DISISA and assigned new tracking #IA-PNM-2019-24.
MarketNM
TechnologyWind
Capacity80.0 MW
StateNew Mexico
CountySwitching Station Torrance County
Point of interconnectionClines Corners 345 kV Switching Station Torrance County, NM Energy Resource
Requested (queue) date2019-04-23
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPublic Service Company of New Mexico

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata