NM Queue Project IA-PNM-2020-05 — Gas in an unlisted county, New Mexico

NM Queue Project IA-PNM-2020-05 — Gas in an unlisted county, New Mexico is a 80.0 MW gas interconnection project with a current status of active. It is proposed to connect at PNM – Generation San Juan Switching Station Waterflow, NM Energy Resource.

80.0 MWCapacity
ActiveStatus
NMMarket
GasTechnology

Project facts

Canonical nameNM Queue Project IA-PNM-2020-05 — Gas in an unlisted county, New Mexico
Queue IDIA-PNM-2020-05
Statusactive
Source statusLGIA executed 6/21/23.
MarketNM
TechnologyGas
Capacity80.0 MW
StateNew Mexico
County
Point of interconnectionPNM – Generation San Juan Switching Station Waterflow, NM Energy Resource
Requested (queue) date2020-01-17
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPublic Service Company of New Mexico

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata