NM Queue Project IA-PNM-2020-19 — Solar+Battery in Otero County, New Mexico

NM Queue Project IA-PNM-2020-19 — Solar+Battery in Otero County, New Mexico is a 76.0 MW solar+battery interconnection project in Otero County, New Mexico with a current status of withdrawn. It is proposed to connect at Iris Del Sol Alamogordo-Holloman Airforce 115kV line Otero County, NM Energy Resource.

76.0 MWCapacity
WithdrawnStatus
NMMarket
Solar+BatteryTechnology

Project facts

Canonical nameNM Queue Project IA-PNM-2020-19 — Solar+Battery in Otero County, New Mexico
Queue IDIA-PNM-2020-19
Statuswithdrawn
Source statusLGIA terminated 10/13/26.
MarketNM
TechnologySolar+Battery
Capacity76.0 MW
StateNew Mexico
CountyOtero County
Point of interconnectionIris Del Sol Alamogordo-Holloman Airforce 115kV line Otero County, NM Energy Resource
Requested (queue) date2020-10-15
Proposed in-service date—
Operational date—
Withdrawn date2026-10-13
Developer—
Utility / transmission ownerPublic Service Company of New Mexico

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-02withdrawn_date—2026-10-13high
2026-11-02statusactivewithdrawnhigh
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.