NM Queue Project IA-PNM-2023-13 — Solar+Battery in Sun Ranch Switching Station Valencia County, New Mexico
NM Queue Project IA-PNM-2023-13 — Solar+Battery in Sun Ranch Switching Station Valencia County, New Mexico is a 100.0 MW solar+battery interconnection project in Sun Ranch Switching Station Valencia County, New Mexico with a current status of withdrawn. It is proposed to connect at Sun Ranch Switching Station Valencia County, NM Network Resource.
Project facts
| Canonical name | NM Queue Project IA-PNM-2023-13 — Solar+Battery in Sun Ranch Switching Station Valencia County, New Mexico |
|---|---|
| Queue ID | IA-PNM-2023-13 |
| Status | withdrawn |
| Source status | Withdrawn 7/15/25. |
| Market | NM |
| Technology | Solar+Battery |
| Capacity | 100.0 MW |
| State | New Mexico |
| County | Sun Ranch Switching Station Valencia County |
| Point of interconnection | Sun Ranch Switching Station Valencia County, NM Network Resource |
| Requested (queue) date | 2023-01-03 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2025-07-15 |
| Developer | — |
| Utility / transmission owner | Public Service Company of New Mexico |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata