NM Queue Project IA-PNM-2023-28 — Solar in Line McKinley County, New Mexico
NM Queue Project IA-PNM-2023-28 — Solar in Line McKinley County, New Mexico is a 80.0 MW solar interconnection project in Line McKinley County, New Mexico with a current status of withdrawn. It is proposed to connect at New Substation on Ambrosia to Yah-Ta- Hey 115 kV Line McKinley County, NM Network Resource.
80.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology
Project facts
| Canonical name | NM Queue Project IA-PNM-2023-28 — Solar in Line McKinley County, New Mexico |
|---|---|
| Queue ID | IA-PNM-2023-28 |
| Status | withdrawn |
| Source status | Withdrawn 7/16/25. |
| Market | NM |
| Technology | Solar |
| Capacity | 80.0 MW |
| State | New Mexico |
| County | Line McKinley County |
| Point of interconnection | New Substation on Ambrosia to Yah-Ta- Hey 115 kV Line McKinley County, NM Network Resource |
| Requested (queue) date | 2023-09-29 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2025-07-16 |
| Developer | — |
| Utility / transmission owner | Public Service Company of New Mexico |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.