NM Queue Project IA-PNM-2023-28 — Solar in Line McKinley County, New Mexico

NM Queue Project IA-PNM-2023-28 — Solar in Line McKinley County, New Mexico is a 80.0 MW solar interconnection project in Line McKinley County, New Mexico with a current status of withdrawn. It is proposed to connect at New Substation on Ambrosia to Yah-Ta- Hey 115 kV Line McKinley County, NM Network Resource.

80.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameNM Queue Project IA-PNM-2023-28 — Solar in Line McKinley County, New Mexico
Queue IDIA-PNM-2023-28
Statuswithdrawn
Source statusWithdrawn 7/16/25.
MarketNM
TechnologySolar
Capacity80.0 MW
StateNew Mexico
CountyLine McKinley County
Point of interconnectionNew Substation on Ambrosia to Yah-Ta- Hey 115 kV Line McKinley County, NM Network Resource
Requested (queue) date2023-09-29
Proposed in-service date
Operational date
Withdrawn date2025-07-16
Developer
Utility / transmission ownerPublic Service Company of New Mexico

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata