NM Queue Project IA-PNM-2023-32 — Solar+Battery in Line Santa Fe County, New Mexico

NM Queue Project IA-PNM-2023-32 — Solar+Battery in Line Santa Fe County, New Mexico is a 50.0 MW solar+battery interconnection project in Line Santa Fe County, New Mexico with a current status of withdrawn. It is proposed to connect at New substation on Algodones - Britton 115 kV Line Santa Fe County, NM.

50.0 MWCapacity
WithdrawnStatus
NMMarket
Solar+BatteryTechnology

Project facts

Canonical nameNM Queue Project IA-PNM-2023-32 — Solar+Battery in Line Santa Fe County, New Mexico
Queue IDIA-PNM-2023-32
Statuswithdrawn
Source statusWithdrawn 7/19/24.
MarketNM
TechnologySolar+Battery
Capacity50.0 MW
StateNew Mexico
CountyLine Santa Fe County
Point of interconnectionNew substation on Algodones - Britton 115 kV Line Santa Fe County, NM
Requested (queue) date2023-09-29
Proposed in-service date
Operational date
Withdrawn date2024-07-19
Developer
Utility / transmission ownerPublic Service Company of New Mexico

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata